Bollard Installation

We offer bollard installations for many types of situations. We can install them on existing concrete slabs and we can also core through concrete or asphalt and build a new concrete footing.

4 Steps to Completion:

1) Planning & Preparation

Bollard Pros Bollard Installation - Site Survey

We start by evaluating the area to check for utilities and to make sure the area remains accessible to help the customer decide which type of bollards will best fit their needs.

If we will be installing embedded bollards we will call for locates to prevent hitting utilities while digging.

2) Concrete & Asphalt Coring

If we install an embedded bollard through concrete or asphalt, we use a coring machine to core through the main surface. We make sure to use a large enough diameter coring bit to allow enough concrete to be poured around the bollard for support. Once we’ve cored our hole, we either dig the hole by hand using a post hole digger, use an auger or a Vactor truck depending on the ground and topography of the area and what we may encounter while digging the hole.

We install the bollard pipe or sleeve in the hole depending on if we’re using a permanent or removable option, align and level the bollard or sleeve, set the height then fill the hole with concrete and finish the concrete around the bollard or sleeve.

Bollard Pros Bollard Installation - Concrete & Asphalt Coring

3) Bollard Preparation & Installation

There are many types of bollards to choose from such as: decorative, surface mounted, surface mount removable, embedded and embedded removable. There are many types of materials used for bollards such as: mild steel, aluminum, stainless steel and wood.

There are many types of coatings to choose from such as: red oxide primer, hot dip galvanized, powder coated and also bare. There are many types of plastic sleeves or covers that cover the bollard pipes with several color options, decorative shapes, flat or rounded top and with or without reflective tape.

Surface mounted bollards work well when anchoring the bollard down to a concrete slab using wedge or epoxy anchors. Asphalt is too soft to support a surface mounted bollard and will need to be cored through to use an embedded version.

4) Finishing

We allow the concrete to cure twenty-four to forty-eight hours. We then remove any bracing that was used to keep the bollards level.

If needed we will clean excess concrete from the bollard surface. If needed we will install reflective tape for nighttime visibility. or cover with a protective plastic sleeve.

Document with photographs and obtain final inspection approval if required.